ab-test-setup
Structured guide for setting up A/B tests with mandatory gates for hypothesis, metrics, and execution readiness.
Install
mkdir -p .claude/skills/ab-test-setup && curl -L -o skill.zip "https://mcp.directory/api/skills/download/2070" && unzip -o skill.zip -d .claude/skills/ab-test-setup && rm skill.zipInstalls to .claude/skills/ab-test-setup
About this skill
A/B Test Setup
1️⃣ Purpose & Scope
Ensure every A/B test is valid, rigorous, and safe before a single line of code is written.
- Prevents "peeking"
- Enforces statistical power
- Blocks invalid hypotheses
2️⃣ Pre-Requisites
You must have:
- A clear user problem
- Access to an analytics source
- Roughly estimated traffic volume
Hypothesis Quality Checklist
A valid hypothesis includes:
- Observation or evidence
- Single, specific change
- Directional expectation
- Defined audience
- Measurable success criteria
3️⃣ Hypothesis Lock (Hard Gate)
Before designing variants or metrics, you MUST:
- Present the final hypothesis
- Specify:
- Target audience
- Primary metric
- Expected direction of effect
- Minimum Detectable Effect (MDE)
Ask explicitly:
“Is this the final hypothesis we are committing to for this test?”
Do NOT proceed until confirmed.
4️⃣ Assumptions & Validity Check (Mandatory)
Explicitly list assumptions about:
- Traffic stability
- User independence
- Metric reliability
- Randomization quality
- External factors (seasonality, campaigns, releases)
If assumptions are weak or violated:
- Warn the user
- Recommend delaying or redesigning the test
5️⃣ Test Type Selection
Choose the simplest valid test:
- A/B Test – single change, two variants
- A/B/n Test – multiple variants, higher traffic required
- Multivariate Test (MVT) – interaction effects, very high traffic
- Split URL Test – major structural changes
Default to A/B unless there is a clear reason otherwise.
6️⃣ Metrics Definition
Primary Metric (Mandatory)
- Single metric used to evaluate success
- Directly tied to the hypothesis
- Pre-defined and frozen before launch
Secondary Metrics
- Provide context
- Explain why results occurred
- Must not override the primary metric
Guardrail Metrics
- Metrics that must not degrade
- Used to prevent harmful wins
- Trigger test stop if significantly negative
7️⃣ Sample Size & Duration
Define upfront:
- Baseline rate
- MDE
- Significance level (typically 95%)
- Statistical power (typically 80%)
Estimate:
- Required sample size per variant
- Expected test duration
Do NOT proceed without a realistic sample size estimate.
8️⃣ Execution Readiness Gate (Hard Stop)
You may proceed to implementation only if all are true:
- Hypothesis is locked
- Primary metric is frozen
- Sample size is calculated
- Test duration is defined
- Guardrails are set
- Tracking is verified
If any item is missing, stop and resolve it.
Running the Test
During the Test
DO:
- Monitor technical health
- Document external factors
DO NOT:
- Stop early due to “good-looking” results
- Change variants mid-test
- Add new traffic sources
- Redefine success criteria
Analyzing Results
Analysis Discipline
When interpreting results:
- Do NOT generalize beyond the tested population
- Do NOT claim causality beyond the tested change
- Do NOT override guardrail failures
- Separate statistical significance from business judgment
Interpretation Outcomes
| Result | Action |
|---|---|
| Significant positive | Consider rollout |
| Significant negative | Reject variant, document learning |
| Inconclusive | Consider more traffic or bolder change |
| Guardrail failure | Do not ship, even if primary wins |
Documentation & Learning
Test Record (Mandatory)
Document:
- Hypothesis
- Variants
- Metrics
- Sample size vs achieved
- Results
- Decision
- Learnings
- Follow-up ideas
Store records in a shared, searchable location to avoid repeated failures.
Refusal Conditions (Safety)
Refuse to proceed if:
- Baseline rate is unknown and cannot be estimated
- Traffic is insufficient to detect the MDE
- Primary metric is undefined
- Multiple variables are changed without proper design
- Hypothesis cannot be clearly stated
Explain why and recommend next steps.
Key Principles (Non-Negotiable)
- One hypothesis per test
- One primary metric
- Commit before launch
- No peeking
- Learning over winning
- Statistical rigor first
Final Reminder
A/B testing is not about proving ideas right. It is about learning the truth with confidence.
If you feel tempted to rush, simplify, or “just try it” — that is the signal to slow down and re-check the design.
When to Use
This skill is applicable to execute the workflow or actions described in the overview.
More by sickn33
View all skills by sickn33 →You might also like
flutter-development
aj-geddes
Build beautiful cross-platform mobile apps with Flutter and Dart. Covers widgets, state management with Provider/BLoC, navigation, API integration, and material design.
drawio-diagrams-enhanced
jgtolentino
Create professional draw.io (diagrams.net) diagrams in XML format (.drawio files) with integrated PMP/PMBOK methodologies, extensive visual asset libraries, and industry-standard professional templates. Use this skill when users ask to create flowcharts, swimlane diagrams, cross-functional flowcharts, org charts, network diagrams, UML diagrams, BPMN, project management diagrams (WBS, Gantt, PERT, RACI), risk matrices, stakeholder maps, or any other visual diagram in draw.io format. This skill includes access to custom shape libraries for icons, clipart, and professional symbols.
ui-ux-pro-max
nextlevelbuilder
"UI/UX design intelligence. 50 styles, 21 palettes, 50 font pairings, 20 charts, 8 stacks (React, Next.js, Vue, Svelte, SwiftUI, React Native, Flutter, Tailwind). Actions: plan, build, create, design, implement, review, fix, improve, optimize, enhance, refactor, check UI/UX code. Projects: website, landing page, dashboard, admin panel, e-commerce, SaaS, portfolio, blog, mobile app, .html, .tsx, .vue, .svelte. Elements: button, modal, navbar, sidebar, card, table, form, chart. Styles: glassmorphism, claymorphism, minimalism, brutalism, neumorphism, bento grid, dark mode, responsive, skeuomorphism, flat design. Topics: color palette, accessibility, animation, layout, typography, font pairing, spacing, hover, shadow, gradient."
godot
bfollington
This skill should be used when working on Godot Engine projects. It provides specialized knowledge of Godot's file formats (.gd, .tscn, .tres), architecture patterns (component-based, signal-driven, resource-based), common pitfalls, validation tools, code templates, and CLI workflows. The `godot` command is available for running the game, validating scripts, importing resources, and exporting builds. Use this skill for tasks involving Godot game development, debugging scene/resource files, implementing game systems, or creating new Godot components.
nano-banana-pro
garg-aayush
Generate and edit images using Google's Nano Banana Pro (Gemini 3 Pro Image) API. Use when the user asks to generate, create, edit, modify, change, alter, or update images. Also use when user references an existing image file and asks to modify it in any way (e.g., "modify this image", "change the background", "replace X with Y"). Supports both text-to-image generation and image-to-image editing with configurable resolution (1K default, 2K, or 4K for high resolution). DO NOT read the image file first - use this skill directly with the --input-image parameter.
fastapi-templates
wshobson
Create production-ready FastAPI projects with async patterns, dependency injection, and comprehensive error handling. Use when building new FastAPI applications or setting up backend API projects.
Related MCP Servers
Browse all serversDeepWiki converts deepwiki.com pages into clean Markdown, with fast, secure extraction—perfect as a PDF text, page, or i
Guide your software projects with structured prompts from requirements to code using the waterfall development model and
Explore Magic UI, a React UI library offering structured component access, code suggestions, and installation guides for
Streamline project docs with Specs Workflow: automate software project plan templates, tracking, and OpenAPI-driven prog
Organize projects using leading project track software. Convert tasks with dependency tracking for optimal time manageme
Spec-Driven Development integrates with IBM DOORS software to track software licenses, automate requirements, and enforc
Stay ahead of the MCP ecosystem
Get weekly updates on new skills and servers.